Mark Harry

Mark Harry

 

 Follow our Blog

 

  MAISON DESIGN

MAISON DESIGN
Architectural Design Consultancy

 
Mark Harry

Home
About Us
Services
The Design Process
Planning
Local Councils
Projects
Related Links

 

Office Address

25 Caldicot Road
Rogiet
Caldicot
Monmouthshire
NP26 3SE

Tel 01291 422712

email mark@maisondesign.biz

 


 


 

CONTEMPORARY DWELLING ORANGERY WITH BESPOKE KITCHEN
MAJOR RELIFT TO COUNTRY HOUSE LEAN-TO UPGRADE
THORNWELL PAVILION EXTENSIONS TO BUNGALOW
HEMP AND LIME BUILDING BUNGALOW ON NARROW PLOT
ECO COTTAGE REFURBISHMENT NEW BUNGALOW
CHURCH HALL GRANNY ANNEXE
FACE LIFT, EXTENSION AND LEISURE DETACHED GARAGE WITH CINEMA ROOM ABOVE
EXTENSION ON EXTENSION NEW DETACHED HOUSE
CONSERVATORY HYBRID SUN LOUNGE WITH GARDEN ASPECT
LEISURE BUILDING TWO STOREY REAR EXTENSION
SUNLOUNGE TO COTTAGE SIDE EXTENSION TO 1930 HOUSE
NEW BESPOKE HOME SUN LOUNGE WITH ARCHED HEAD
METHODIST CHURCH EXTENSION ST BRIAVELS CASTLE EXTENSION
TO TRANSFORM ONE SMALL BUNGALOW BRYN GWYNANT YOUTH HOSTEL

 

'

Why move when you can extend to your own tastes and accommodate your own needs. This is a two storey rear extension to facilitate a modern kitchen with open family area combined to a light and airy Al Fresco Dining

Existing Rear Facade of House
poor ground combined with snow then rain led to this trench subsidence 6'-0" down within the trenches and tidying up prior to to pouring of concrete for foundations. What's the old saying 'You can not make an omelette without cracking eggs'
Concrete being pumped up and over the house into the awaiting trench All steel beams in at first floor level ready to accept floor joists. Muck removal made a lot simplier with machines less than 3'-0" wide. It comes to all of us, poor ols wheel barrow made redundant. 5 weeks into the job and next stage will be scaffolding up
8 weeks into the job and roof carcassing almost complete. The main gable is being bricked up to the profile of the roof. Floor joists can now not protrude the inner skin so are hung off heavy duty hangers. Properly secured both sides by plywood
Corner brick pier with exposed inner post supporting roof over Dining Area. The post will of course be hidden between the windows 12 weeks into the job. Roof tiles went on last week which makes the inside watertight. Due to the amount of rain recently the roof details can not be finished. Work is proceeding inside with first floor walls being constructed and plasterboard being fixed.
The old outside wall has now been demolished into the house. The Dresser has been covered over. The next day the adjoining wall will be demolished into the Kitchen. CAT 5 ready for HOME AUTOMATION. Everyone has a computer at home so why not take advantage of this at first fix stage.
Completed works. View shows devide between kitchen and dining areas. View on bespoke Oak kitchen units
View from kitchen island into family area with built in Plasma screen Kitchen island with LED quatrz lights built into base. Note the oversailing worktop which achieves the breakfast space needed.
Finished Project. Duration 7 months and within stated time
 
 Return to list of projects
 

Disclaimer - Please read
Site designed by Mark Harry, Programmed by JETA Solutions Ltd

Adidas Ultra Boost Shoes Adidas Springblade Skechers D Lites Supra Bleeker Nike Air Max Shoes Adidas Originals Superstar II Adidas Yeezy Boost 350 Adidas NMD XR1 Sneakers Adidas Stan Smith Adidas Originals Superstar Nike Sock Dart Kids Nike Air MAX 90 Air Force 1 Low BR Shoes Nike Sock Dart Nike Air Huarache Nike Internationalist Adidas Original NMD Adidas Ultra Boost Shoes UK Air Jordan Shoes Adidas Yeezy 350 Boost Turtle Dove