Revamp the exterior completely with major reworks. Triple garage and Leisure building for swimming pool and tennis court |
 |
| Why does it always rain at Ground works? Demolish existing garage and Study. |
'
 |
 |
| When the weather is agianst you, proper machinery is a must |
Foundations down and getting ready for slab |
 |
 |
| The mesh to the right of photo is on standby for the slab |
Slab to Leisure building to be laid after all the services are installed to the pool |
 |
 |
| Rockwool mineral fibre insulation and stone labelling all stacked, sealed and ready |
Over view of Triple garages to the left and main extension to the house in front. Inner skin of insulation blocks just started a few days ago. |
 |
 |
| The old house partially demolished. Room now temporarily used as a Canteen with aspect. |
Sun patterns on the Master Bedroom wall |
 |
 |
| Random rubble stonework to the sides of Implement store and Triple garages |
Randon rubble stonework to the sides of Implement store and Triple garages |
 |
 |
| Stone quoins cut into the existing house |
Facade of Existing part of the house showing the new quoins |
 |
 |
| Drying out each room takes a little bit of help. |
Garages are almost complete apart from decoration and the automatic doors. |
 |
| Main structural work is now over. First fix is complete and the plasterers are now attacking each room systematically. |
 |
|
| |