This is an infill plot within the clients garden. The garden is level with good access. |
 |
Site scraped and foundations dug. Concrete has just been poured for the foundations |
'
 |
 |
View on foundations to front of Bungalow |
Corners of Bungalow being built up to dpc from setting out strings |
 |
 |
External corner of Living room being built up from founds |
Corner of Bungalow with outer leaf up to dpc |
 |
 |
Profiles still insitu. Next stage laying of slab |
All ready for insulation and concrete slab. Remember to oversail the dpm for Radon Barrier. Now is the time to check and recheck all drains and services within the slab |
 |
 |
Slab down which was a special self levelling concrete. |
Polystyrene upstand taped all round nice and neat |
 |
 |
Timber frame just erected showing no noggings but skin of blockboard to aid stability |
Outside view of Front Bedroom. Timber frame stage. Note that the frame as seen took just 4 days to erect and thats with a cut roof. |
 |
 |
Early view of Living room with gallery ceiling. Well, it will have. All stop for Christmas. Roof will be finished in the New Year. |
Roof now felt and battened. Or should I be now be saying 'breather membrane and battened'. One advantage of using the modern breather membrane is that it lets the light thorough so that trades can continue inside without the need of generator and lights. This view is in the gallery Living room |
 |
 |
Rear view of roof already to be stacked with slates. Bricklayer ready to go also |
Slates in the process of being fixed. Bricks ready in waiting |
 |
 |
PIR insulation cut neatly between rafters. Insulation is not cheap so the tighter the fit the better value for money you will recoup in energy saving |
Bricklayers just starting on the outer skin of bricks. At long last some decent weather |
 |
 |
View of ceiling showing valley rafters and Glulam Ridge Beam which all will become features within the Living Room |
Brickwork complete all ready for windows |
 |
 |
Front of Bungalow all ready for windows and also delayed deepflow guttering. Please note clean site is Safe site |
Rear Elevation. Path laid and grass seed down for future lawn. Walls awaiting plastering inside |
 |
 |
Front Elevation. Aco drain being laid infront of garage door |
Side Elevation. Paths being laid |
 |
|
|